Latest pictures of 3K house

The architects own house is “never” completed. They like to see it as an ongoing art project. But anyway we would like to share some of the latest picture of 3K house.
IMG_3745-2.JPG

IMG_3743-3.JPG

IMG_3744-2.JPG

IMG_3742.JPG

IMG_3747.JPG

IMG_3741.JPG

IMG_3746.JPG

Posted in exterior, interior, Uncategorized | Comments Off

Other sides of the exterior revealed

photo from the back, living rooms and ground floor windows

photo from the back, living room and ground floor windows

IMG_6183sm

Posted in exterior | Tagged | Comments Off

It is gradually transforming from a “house” to a “home”

There is a lot of interior work left to be completed, but the houseĀ is feeling more like home every day passing by. The fireplace will be a project that will continue in fall, as well as the kitchen is not completed

view from the kitchen island

view from the kitchen island
living room-mezzanine

living room-mezzanine

view from the entry foyer

view of the kitchen peninsula from the stairs.

view of the kitchen peninsula from the stairs.

IMG_5828sm

view from the mezzanine to the living

view from the mezzanine to the living

view of from the kitchen from sink to the peninsula eat in area

view of from the kitchen from sink to the peninsula eat in area

view of the stairs from the shaft.

view of the stairs from the shaft.

 

 

 

Posted in interior | Tagged , , , , | Comments Off

Exterior progress

I just run outside to take a few pictures of the house, as it’s coming along. I realized that next time I will need a better tripod. There is lot that needs to be done, but it was interesting to see the play of the lights from the interiors, and the highlights of the volumes.

20131231-134420.jpg

20131231-134435.jpg

20131231-134459.jpg

Posted in exterior, Uncategorized | Tagged , , | Comments Off

Flooring installation

20131228-113801.jpg

Posted in Uncategorized | Comments Off

Working on the interiors, as it snows outside

20131211-124526.jpg

20131211-124644.jpg

20131211-124719.jpg

20131211-124749.jpg

20131211-124823.jpg

20131211-124854.jpg

20131211-124941.jpg

20131211-125135.jpg

Posted in Uncategorized | Tagged , , , , | Comments Off

Progress of the front

An iPhone photo taken yesterday that shows the progress of the front of the 3k house. There is a lot of digging and site work happening for building the front stairs as well as the driveway.

20131017-142559.jpg

Posted in exterior | Comments Off

Roof deck

20131008-100043.jpg

20131008-100128.jpg
The railing is almost completed. Time to take a break

Posted in deck | Tagged , | Comments Off

Stairs

20131005-170520.jpg

20131012-125515.jpg

20131231-134822.jpg

20131231-134839.jpg

Posted in interior | Tagged , | Comments Off

Dario’s bedroom

Dario’s room is almost completed. He is very found of Lego. The wall color was his selection. The Lego-Sleepover space is built over his closet. He has his own bathroom.

DarioBedroom (1)

DarioBedroom (2)

DarioBedroom (3)

DarioBedroom (4)

DarioBedroom (5)

DarioBedroom (6)

DarioBedroom (7)

Posted in interior | Tagged , , | Comments Off